D9T Track-Type Tractor Power Train – Idler – Install

Installation Procedure




    Illustration 1 g01087217

  1. Attach a suitable lifting device to idler (1). Position idler (1). The weight of the idler is approximately 408 kg (900 lb).
  1. Position cap (2) .
  1. Install bolts (3). Tighten bolts (3) to a torque of 1600 ± 200 N·m (1180 ± 148 lb ft).
  1. Install bolts (4). Tighten bolts (4) to a torque of 1600 ± 200 N·m (1180 ± 148 lb ft).

End By:
Connect the track. See Disassembly and Assembly, “Track – Connect”.

Posted in D9Tagged