Removal Procedure
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | FT-1897 | Bracket As | 1 |
B | 138-7575 | Link Bracket | 2 |
C | 138-7573 | Link Bracket | 2 |
D | – | Forcing Screw (1/2 by 13 by 4 inch) |
2 |
E | – | Bolt (1/2 by 13 by 3 inch) |
2 |
Start By:
- Remove the bottom guard. Refer to Disassembly and Assembly, “Bottom Guard – Remove”.
- Remove the axles. Refer to Disassembly and Assembly, “Axle – Remove”.
- Remove the drive shaft. Refer to Disassembly and Assembly, “Main Drive Shaft – Remove”.
- Remove the ripper control valve. Refer to Disassembly and Assembly, “Ripper Control Valve – Remove”.
- Attach a suitable lifting device onto guard assembly (2) . The weight of guard assembly (2) is approximately 145 kg (320 lb). Disconnect grease hose assembly (3) . Remove bolts (4) .
|
|
|
|
Illustration 2 | g01091671 |
- Repeat Step 3 for the opposite side.
- Drain the power train oil into a suitable container for storage or for disposal. Refer to Operation and Maintenance Manual, “Transmission System Oil and Screens – Change/Clean”.
- Remove filter (9) . Disconnect harness assemblies (10) and (14) . Disconnect hose assemblies (11) and (12) . Remove cover (13) .
|
|
|
|
Illustration 5 | g01101240 |
- Remove bolts (16) and plate (17) .
- Install Tooling (E) in bolt holes (18) in order to support housing assembly (19) . Remove bolts (19A) . Use Tooling (D) to separate housing assembly (19) from the case.
|
|
|
|
Illustration 7 | g01150815 |
|
|
|
|
Illustration 8 | g01150816 |
- Install Tooling (A) onto transmission and bevel gear (20) . Attach Tooling (B) and a suitable lifting device onto Tooling (A) . The weight of transmission and bevel gear (20) is approximately 1497 kg (3300 lb). Install Tooling (D) . Remove bolts (21) and (22) . Slide out transmission and bevel gear (20) . Position transmission and bevel gear (20) on suitable cribbing. Remove Tooling (A) and (B) .
|
|
|
|
Illustration 9 | g01150824 |