26SI Series Alternator – Manage Major Repair Tracking

Track Major Repairs

EquipmentManager can track major repairs in the same way that EquipmentManager can track planned maintenance schedules. You must configure EquipmentManager to track major repairs through the Administration screens.

In order to add or remove the tracking of major repairs, use the following procedure:

  1. From either the “Administration” screen or the “View” dropdown, select “Track Major Repairs”.

    If equipment has already been selected, the “Track Major Repairs Results” screen is displayed.

    If you have not already selected equipment, complete the “Equipment Search” fields and click “Display Equipment” before proceeding to the next step.

  1. Select the radio button next to the pieces of equipment for which major repairs are to be tracked.
  1. Click the “Track Major Repairs” button. The “Track Major Repairs” screen will be displayed.



    Illustration 1 g01737054

    “Track Major Repairs”

    (1) “Add” button

  1. From the “Select Repairs to track” list box, select all major repairs you wish to add to the repair tracking.

    Note: Multiple repairs can be selected by holding down the “Ctrl” key and clicking on the items you wish to select.

  1. Click the “Add” button (1). The repair is moved from the “Select Repairs to track” list box to the “Repairs selected to track” list box.
  1. From the “Repairs selected to track” list box, select all repairs you wish to remove from the repair tracking.
  1. Click the “Remove” button. The repair is moved from the “Repairs selected to track” list box to the “Select Repairs to track” list box.
  1. Click the “Continue” button.

    The “Configure Repair Tracking intervals” screen will be displayed.




    Illustration 2 g01737055

    “Configure Repair Tracking intervals” screen

    (2) “Save” button

    (3) “Start tracking repair from” text field

    (4) “Configured Interval” text field

  1. In the “Configured Interval” text field (4), enter the number of hours that represents the interval for each repair.
  1. In the “Start tracking repair from” text field (3), enter the SMU hours you wish the repair to begin being tracked.
  1. Click the “Save” button (2). The “Confirmation – Configure Repair Tracking Intervals” screen will be displayed.



    Illustration 3 g01737056

    “Confirmation – Configure Repair Tracking Intervals” screen

  1. Click “OK”. The major repair tracking is saved.



Illustration 4 g01737057

“Configure Repair Tracking intervals” screen if repairs have been deleted from “Track Major Repair” details

(2) “Save” button

If you removed any events or major repairs, clicking the “Save” button (2) will result in Illustration 4.

Posted in D6Tagged