Remove & Install Ripper Shank 1. Position machine on an incline as shown. Block front of machine and apply service brake. 2. Lower ripper shank…
Category: D11
Separation of Tracks The machine must be on a level, hard surface before a separation of the track is made. Any time a separation of…
NOTE: For instruction on reusability, refer to Guideline For Reusable Parts: Sealed and Lubricated Track, SEBF8558. Maximum track press assembly force (earlier) … 1245 Kn…
Remove Track Adjuster Fluid Spillage Containment Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair…
Remove Recoil Spring Before doing any service work which requires separating a track, a thorough inspection of the front track roller frame must be made.…
Remove & Install Track Rollers Fluid Spillage Containment Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting…
Single and Double Flange Earlier 74Z End play (clearance) of the roller shaft: Minimum … 0.25 mm (.010 in) Maximum … 0.85 mm (.033 in)…
(1) Torque for elbow in bottle … 25 N·m ± 3 N·m (18.50 ± 2 lb ft)
Remove & Install Idlers (8ZR) Start By: a. separation of track 1. Fasten a suitable lifting device to idler (1). 2. Remove bolts (2) and…
Remove & Install Idlers (74Z & 4HK) Start By: a. separation of track 1. Fasten a hoist to idler (1) as shown. 2. Remove bolts…